Smallest valuable increment
The least you can ship that a user would actually notice and use.
Each increment should deliver something a user can use, not a layer of the stack. Finding it means asking what the user gets at each step. Small valuable increments shorten feedback loops and make plans easier to change.
Why it matters for a product engineer
A layer of the stack is not something a user can use. The smallest valuable increment is: something a real user notices and uses, however small. It starts feedback while changes are still cheap, and it keeps the plan easy to change. Engineers find it by asking, at each step, what a user can do now that they could not do before.
How to do it
- Describe the problem and whom it affects. Then ask, as Henrik Kniberg does, “What is your skateboard?”: the smallest thing you can put in the hands of real users.
- Cut along the problem, not along the code: one region, one type of customer, one kind of case.
- Make each increment usable on its own, even if users still do the rest the old way.
- Give it to real users who know it is early, and collect what they say and do.
- Add the next case or region only when the current one works for its users.
Common mistakes
- Increments that are technical layers: the database first, the interface last.
- An increment so small that all the feedback is about what is missing.
- One big release to everyone after years of work.
- Waiting for perfect. Lego Universe had about 250 people for four to five years; it closed two years after its release.
Example
The Swedish police wanted laptops in their cars, with the systems officers need on the road. An earlier attempt had taken seven years to reach a first release. This time version 1.0 supported a couple of crime types and was tested by a handful of police in one region. Other cases were still done the old way, at the station.
Two releases of the same police system
| PUST Java | PUST Siebel, the follow-up | |
|---|---|---|
| First users | A handful of police in one region | All 12,000 police at once |
| First scope | A couple of crime types | The whole next generation |
| ResultSiebel cost about €20M to build; internal studies put the cost to society near €1B | A calm national release | Shut down after half a year |
The same police and the same kind of system. Small releases to real users worked; one big release did not.
ReportedHenrik Kniberg, who coached the project, 2016
Sources: Making sense of MVP, and why I prefer earliest testable, usable, lovable (Henrik Kniberg) ↗ · Vertical slicing: from initiative to user stories (Humanizing Work) ↗
Resources
2- articleStart here
Making sense of MVP, and why I prefer earliest testable, usable, lovable ↗
Henrik Kniberg · 2016 · 10 minThe skateboard-to-car drawing explained: each release should be usable on its own, not one wheel of a car.
- articleStart here
Vertical slicing: from initiative to user stories ↗
Humanizing Work · 4 minHow slicing works at every level, from a quarter-long initiative down to a single story.