X.1.3 · Skill in Critical thinking

Challenging requirements

Asking why before building what was asked.

Requirements are often a proposed solution to an unstated problem. Asking what problem it solves and what happens if it is not built often leads to something simpler. Doing it respectfully is part of the skill.

Your status · Challenging requirements

Saved in this browser. Sign in to keep it on every device.It colours this skill's tile on your map.

Why it matters for a product engineer

A requirement often arrives as a solution: “add a calendar”, “export to Excel”, “send a notification”. Behind it there is a problem that nobody wrote down. If you build the solution as asked, you may build something big that solves the problem badly. If you find the problem first, the answer is often smaller and better. Product engineers see the cost of each option, so they are in a good position to ask the question, as long as they ask it to help, not to block.

How to do it

  1. Ask about the moment of need: “When did you need this? What were you trying to do?”
  2. Write the problem in one sentence, separate from the requested solution.
  3. Check how many people have the problem, and how they solve it today.
  4. Propose the smallest solution that solves that problem, with its cost.
  5. Agree on the problem with the person who asked before you build anything.

Common mistakes

  • Building exactly what was asked because it is faster than asking.
  • Asking “why?” in a way that sounds like a refusal.
  • Asking people to describe the solution they want instead of what happened.
  • Challenging every request, including small, clear ones.

Example

Soon after Basecamp 3 launched without a calendar, customers asked for one. A full calendar could take six months or more, and only about 10% of customers had used the calendars in past versions. So the team called a customer and asked when she had wanted a calendar. She had driven to her office to check a wall calendar for free meeting rooms. The real need was to see free days. The team built the Dot Grid, a much smaller calendar, in a six-week cycle.

Side by side

Basecamp's calendar request, before and after asking

As requestedAs built
NeedEverything a calendar doesSee free days
Time to buildSix months or moreSix weeks
Based onThe word "calendar"One real story

The question was not why she wanted a calendar, but when she needed one. The answer made the project much smaller.

ReportedRyan Singer, Shape Up, chapters 2 and 3

Sources: Shape Up, chapter 2: principles of shaping (Ryan Singer, Basecamp) ↗ · Shape Up, chapter 3: set boundaries (Ryan Singer, Basecamp) ↗ · The XY problem (xyproblem.info) ↗

Resources

3
  • articleStart here
    The XY problem ↗
    xyproblem.info · 2 min

    People ask about their attempted solution instead of their real problem. Asking what they are really trying to do is how you push back on a requirement.

  • articleStart here
    Five whys ↗
    Wikipedia · 9 min

    The technique, its origin at Toyota, and the honest criticism of where it falls short.

  • articleStart here
    Problem statements in UX discovery ↗
    NN/g · 2021 · 8 min

    What a good problem statement contains and why a discovery effort should have exactly one.