06.4.2 · Skill in Experiment design

Control groups

A comparison group that does not get the change.

A control group shows what would have happened without the change. Without it, seasonal effects, marketing pushes and bugs look like results. Holdout groups extend the idea over longer periods.

Your status · Control groups

Saved in this browser. Sign in to keep it on every device.It colours this skill's tile on your map.

Why it matters for a product engineer

A control group shows what would have happened without the change. Without one, a season, a marketing campaign, a bug fix or simply what people believe can look like a result. For a product engineer, the control group is what turns “the number went up after we shipped” into “the change moved the number”.

How to do it

  1. Decide which unit gets the change, such as a user or an account, and keep a group of the same units without it.
  2. Assign units to the groups by chance, not by who volunteers.
  3. Measure both groups in the same way, over the same period.
  4. For long-term effects, keep a small holdout group without new features for months. GrowthBook lists the costs: those users miss improvements, and the feature flags must stay in the code for the whole period.
  5. Measure behaviour in both groups. What people report about themselves is not a control.

Common mistakes

  • Comparing before and after a launch, as if nothing else changed.
  • Using the people who chose not to use a feature as the control.
  • A holdout group that receives the new features through another path.
  • Ending the holdout before the long-term effect has time to show.

Example

In 2025, METR ran a randomized trial with 16 experienced open-source developers, on 246 real issues in their own repositories. Each issue was randomly assigned to allow AI tools or not, so the issues without AI were the control. With AI, the developers took 19% longer. Before the study, they expected AI to make them 24% faster. Afterwards, they still believed it had made them 20% faster. METR says these results describe early-2025 tools, and it has since published newer data.

Numbers

AI and developer speed: what people believed, and what the control showed

24%
Faster, expected before
20%
Faster, believed after
19%
Slower, measured

Without a control group, the study would have reported what the developers believed: a speedup. The randomized control showed the opposite.

ReportedMETR, 10 Jul 2025, early-2025 AI tools

Sources: Measuring the impact of early-2025 AI on experienced open-source developer productivity (METR) ↗ · Holdout experiments (GrowthBook docs) ↗

Resources

1
  • docsStart here
    Holdout experiments ↗
    GrowthBook docs · 2026 · 10 min

    How to keep a group of users without new features to measure long-term impact, and the trade-offs of doing so.

Tools

1
  • ToolOpen source
    GrowthBook

    Open-source feature flags and A/B testing that analyzes results from your own data warehouse.